Pipeline work along Causeway to resume Monday - FOX10 News | WALA

Pipeline work along Causeway to resume Monday

Posted: Updated:

Nearly a year after a failure, work on a pipeline along the Causeway will resume Monday. 

The pipe burst on New Year's Day. Repairs started right away to replace the 3,000-foot water pipeline that services Spanish Fort, but it stopped after the pipe collapsed during the repair. It took months for MAWSS to figure out what happened.

This time, MAWSS will be using a different subcontractor, new casing pipe and drilling 10 feet deeper than the first attempt. They expect to finish the work by the end of March.

All content © 2017, WALA; Mobile, AL. (A Meredith Corporation Station). All Rights Reserved.  

Powered by Frankly
FOX10TV.com
Powered by WorldNow CNN
All content © 2018, WALA; Mobile, AL. (A Meredith Corporation Station) . All Rights Reserved.
For more information on this site, please read our Privacy Policy, and Terms of Service, and Ad Choices.